The content on this page was provided by an independent third party and syndicated by XPR Media. Members of the editorial and news staff of the USA TODAY Network were not involved in the creation of this content.

U.S. Data Center Construction Market to Reach USD 154.49 Billion Investment by 2031, Growing at 10.70% CAGR | Arizton

Expansion Led by Apple, Aligned Data Centers, AWS, CyrusOne, DataBank, and Digital Realty

Lithium-ion batteries, with higher energy density and longer lifecycle performance, are becoming the preferred choice for AI-driven facilities.”
— Ryan Turner

CHICAGO, IL, UNITED STATES, February 25, 2026 /EINPresswire.com/ — The U.S. data center construction market is entering a high-growth phase, driven by rapid expansion in artificial intelligence, cloud computing, and data-intensive digital services. Investment valued at USD 83.97 billion in 2025 and projected to reach USD 154.49 billion by 2031, the market is being reshaped by rising demand for high-density computing, advanced storage systems, and power-intensive infrastructure. As enterprises accelerate migration toward public and hybrid cloud platforms, developers are expanding capacity to support low-latency, high-performance workloads and evolving regulatory requirements. At the same time, elevated construction costs and power constraints are intensifying competition for cost-efficient, energy-secure locations, making strategic site selection a critical factor in long-term market growth.

Report Snapshot:
MARKET SIZE BY INVESTMENT (2031): USD 154.49 Billion
MARKET SIZE BY INVESTMENT (2025): USD 83.97 Billion
CAGR BY INVESTMENT (2025-2031): 10.70%
MARKET SIZE – AREA (2031): 52.57 Million Sq. Ft.
POWER CAPACITY (2031): 13,565 MW
HISTORIC YEAR: 2022-2024
BASE YEAR: 2025
FORECAST YEAR: 2026-2031
MARKET SEGMENTATION: Facility Type, Infrastructure, Electrical Infrastructure, Mechanical Infrastructure, Cooling Systems, Cooling Technique, General Construction, Tier Standards, and Geography

AI Is Reengineering the Future of Data Center Infrastructure
AI is transforming the landscape of the global data center market, as rising adoption across industries continues to drive the expansion of hyperscale facilities and high-density infrastructure. While current AI investments have not yet fully offset overall hyperscale growth, the capacity of data centers dedicated to AI workloads is expected to nearly triple over the next five to six years. As a result, new facilities are increasingly being designed to support high-performance, AI-optimized environments that can handle complex and compute-intensive applications. This shift toward AI-focused infrastructure is directly accelerating the adoption of GPUs across data centers worldwide. To meet the growing demand for faster model training, real-time inference, and improved energy efficiency, operators are deploying GPU-powered systems capable of massively parallel computing. These technologies are enabling scalable, high-density facilities that can support next-generation AI workloads while maintaining operational efficiency.

Advanced Cooling Is Emerging as a Critical Enabler of AI-Ready Data Centers
Advanced cooling solutions are becoming essential for modern data centers as AI, ML, and IoT workloads continue to drive higher power density and heat generation. To maintain performance, reliability, and energy efficiency, operators are increasingly adopting liquid cooling, hybrid thermal systems, and sustainable cooling technologies that support high-density, AI-ready infrastructure while reducing power and water consumption. This shift is being accelerated through partnerships between data center operators, cooling technology providers, and energy innovators. A key example is the USD 1.9 billion agreement between Switch and Schneider Electric in November 2025, highlighting how advanced cooling and collaborative innovation are becoming central to building scalable, efficient, and future-ready data center facilities.

Power Systems are Becoming the New Competitive Edge in U.S. Data Centers
The rapid expansion of high-density AI and cloud workloads in the U.S. is driving a fundamental shift in data center power infrastructure. As rack densities exceed 20 kW to 30 kW, operators are increasingly adopting advanced UPS systems, lithium-ion batteries, energy storage solutions, and low-emission generator technologies to maintain reliability and energy efficiency. Modern battery and power systems are evolving into strategic assets, enabling lower operating costs, faster commissioning, and improved grid interaction. Lithium-ion batteries, with higher energy density and longer lifecycle performance, are becoming the preferred choice for AI-driven facilities.
Reflecting this transition, Google has deployed more than 100 million lithium-ion cells across its global data center portfolio, leveraging a 48V DC rack-level power architecture with integrated Battery Backup Units (BBUs) to ensure uninterrupted, high-performance operations. Together, these developments highlight how advanced power infrastructure is now central to scalability, resilience, and long-term competitiveness in the U.S. data center construction market.

Access complete data tables and in-depth insights of market

The U.S. Data Center Construction Market Research Report Includes Size, Share, and Growth in Terms of
• Facility Type: Hyperscale Data Centers, Colocation Data Centers, and Enterprise Data Centers
• Infrastructure: Electrical Infrastructure, Mechanical Infrastructure, and General Construction
• Electrical Infrastructure: UPS Systems, Generators, Transfer Switches & Switchgears, PDUs, and Other Electrical Infrastructure
• Mechanical Infrastructure: Cooling Systems, Racks, and Other Mechanical Infrastructure
• Cooling System: CRAC & CRAH Units, Chillers Units, Cooling Towers, Condensers, and Dry Coolers, and Other Cooling Units
• Cooling Techniques: Air-based Cooling and Liquid-based Cooling
• General Construction: Core & Shell Development, Installation & Commissioning Services, Engineering & Building Design, Fire Detection & Suppression, Physical Security, and DCIM/BMS Solutions
• Tier Standards: Tier I & Tier II, Tier III, and Tier IV
• Regions: Southeastern U.S., Midwestern U.S., Southwestern U.S., Western U.S., and Northeastern U.S.

Key Data Center Support Infrastructure Providers
• ABB
• Caterpillar
• Cummins
• Delta Electronics
• Eaton
• Legrand
• Rolls-Royce
• Schneider Electric
• STULZ
• Vertiv
Other Data Center Support Infrastructure Providers
• Airedale
• Alfa Laval
• Asetek
• Bloom Energy
• Carrier
• Condair
• Cormant
• Cyber Power Systems
• Enlogic
• FNT Software
• Generac Power Systems
• Green Revolution Cooling (GRC)
• HIMOINSA (Yanmar)
• HITEC Power Protection
• Johnson Controls
• KOHLER (Rehlko)
• KyotoCooling
• Mitsubishi Electric
• Natron Energy
• NetZoom
• Nlyte Software
• Rittal
• Siemens
• Trane
• ZincFive
Key Data Center Construction Contractors
• AECOM
• Ames Construction
• Arup
• Barge Design Solutions
• Burns & McDonnell
• Corgan
• DPR Construction
• Fortis Construction
• Haydon
• Holder Construction
• Jacobs
• KDC
• Kiewit Corporation
• Lewis Michael Consultants
• Morgan Construction
• Morgan Corp
• Page
• Rogers-O’Brien Construction
• Rosendin Electric
• Syska Hennessy Group
• Turner Construction
Other Data Center Construction Contractors
• AlfaTech
• Aplena
• Black & Veatch
• BlueScope Construction
• Brasfield & Gorrie
• CallisonRTKL
• Clark Construction Group
• Clayco
• Climatec
• Clune Construction
• EMCOR Group
• EYP MCF
• Fitzpatrick Architects
• Fluor Corporation
• Gensler
• Gilbane Building Company
• Gray
• HDR
• Hensel Phelps
• HITT Contracting
• Hoffman Construction
• JE Dunn Construction
• JHET Architects,
• JTM Construction Group
• kW Engineering
• Linesight
• M+W Group (Exyte)
• McCarthy Building Companies
• Morrison Hershfield
• Mortenson
• Pepper Construction
• Rosendin
• Ryan Companies
• Salute Mission Critical
• Sheehan Nagle Hartray Architects
• Skanska
• Southland Industries
• STO Building Group
• Sturgeon Electric Company
• Suffolk Construction
• Sundt Construction
• The Mulhern Group
• The Walsh Group
• The Weitz Company
• The Whiting-Turner Contracting Co.
• TRINITY Group Construction
• Walbridge
• WSP
Key Data Center Investors
• Apple
• Applied Digital
• AWS
• CyrusOne
• DataBank
• Digital Realty
• Equinix
• Google
• Meta
• Microsoft
• NTT DATA
• Vantage Data Centers
Other Data Center Investors
• AAIM Data Centers
• Aligned Data Centers
• American Tower
• Aubix
• Centersquare
• CloudHQ
• Cologix
• Compass Datacenters
• COPT Data Center Solutions
• Core Scientific
• Centra
• Crusoe
• DartPoints
• DC BLOX
• DigiPowerX (DigiHost)
• EdgeConneX
• EdgeCore Digital Infrastructure
• Element Critical
• FifteenFortySeven Critical Systems Realty (1547)
• Flexential
• H5 Data Centers
• HostDime
• Hut 8
• Iron Mountain
• Netrality Data Centers
• Novva Data Centers
• PhoenixNAP
• PowerHouse Data Centers
• Prime Data Centers
• QTS Realty Trust
• Sabey Data Centers
• Skybox Datacenters
• STACK Infrastructure
• Stream Data Centers
• Switch
• T5 Data Centers
• TierPoint
• WhiteFiber
• Yondr
• 365 Data Centers
• 5C Data Centers
• New Entrants
• Ada Infrastructure
• Ardent Data Centers
• Beale infrastructure
• Big Sky Digital Infrastructure
• CleanArc Data Centers
• CloudBurst Data Centers,
• Colovore
• Crane Data Centers
• Edged Energy
• Fleet Data centers
• Lambda
• LightHouse Data Centers
• Metroblocks
• NE Edge
• Penzance
• Prometheus Hyperscale
• Quantum Loophole
• RadiusDC
• Related digital
• Rowan Digital Infrastructure
• Sailfish Investors
• Tract

Discover Connected Market Opportunities:
U.S. Data Center Colocation Market – Industry Outlook & Forecast 2025-2030
https://www.arizton.com/market-reports/us-data-center-colocation-market
Global Data Center Construction Market Landscape 2025-2030
https://www.arizton.com/market-reports/data-center-construction-market-investment-forecast

What Key Findings Will Our Research Analysis Reveal?
• How big is the U.S. data center construction market?
• What is the estimated market size in terms of area in the U.S. data center construction market by 2031?
• What is the growth rate of the U.S. data center construction market?
• What are the key trends in the U.S. data center construction market?
• How many MW of power capacity is expected to reach the U.S. data center construction market by 2031?

Why Arizton?
100% Customer Satisfaction
24×7 availability – we are always there when you need us
200+ Fortune 500 Companies trust Arizton’s report
80% of our reports are exclusive and first in the industry
100% more data and analysis
1500+ reports published till date

Post-Purchase Benefit
• 1hr of free analyst discussion
• 10% off on customization

About Us:
Founded in 2017, Arizton Advisory & Intelligence delivers data-driven market research and strategic consulting that empowers clients to make informed decisions and drive growth. Combining quantitative and qualitative insights, we provide in-depth analysis across industries including Agriculture, Consumer Goods, Technology, Automotive, Healthcare, Data Centers, and Logistics. Recognized by top-tier media, our expert team transforms complex market data into actionable strategies, helping clients anticipate trends, seize opportunities, and stay ahead of the competition.

Jessica
Arizton Advisory & Intelligence
+1 312-680-2940
jessica@arizton.com
Visit us on social media:
LinkedIn
Facebook
X

Legal Disclaimer:

EIN Presswire provides this news content “as is” without warranty of any kind. We do not accept any responsibility or liability
for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this
article. If you have any complaints or copyright issues related to this article, kindly contact the author above.

Information contained on this page is provided by an independent third-party content provider. XPRMedia and this Site make no warranties or representations in connection therewith. If you are affiliated with this page and would like it removed please contact pressreleases@xpr.media

JUNK.COM ENGAGES LOCAL FAMILIES AT MIAMI TOUCH-A-TRUCK EVENT

JUNK.COM ENGAGES LOCAL FAMILIES AT MIAMI TOUCH-A-TRUCK EVENT

MIAMI, FL, UNITED STATES, February 26, 2026 /EINPresswire.com/ — Engines may be turned off, but the excitement was

February 26, 2026

MONDAINE Introduces the Classic Day Date in a Bold New 40 mm Size

MONDAINE Introduces the Classic Day Date in a Bold New 40 mm Size

Inspired by the Official Swiss Railways Station Clock, this Swiss Made timepiece delivers everyday precision and

February 26, 2026

After Record-Breaking Year, Newfi Lending (‘Newfi’) Maintains Momentum Through Organic and Inorganic Growth

After Record-Breaking Year, Newfi Lending (‘Newfi’) Maintains Momentum Through Organic and Inorganic Growth

EMERYVILLE, CA, UNITED STATES, February 26, 2026 /EINPresswire.com/ — Newfi, a leading non-agency mortgage lender

February 26, 2026

The Living Legends Foundation Program Presents the 13th A.D. Washington Golf Tournament in ATL on April 18, 2026

The Living Legends Foundation Program Presents the 13th A.D. Washington Golf Tournament in ATL on April 18, 2026

Honoring Legacy. Investing in the Future. The LLF Scholarship Fund Supports Black College Students Pursuing Careers in

February 26, 2026

U.Santini Moving & Storage Marks More Than 85 Years of Trusted Brooklyn Moving Services

U.Santini Moving & Storage Marks More Than 85 Years of Trusted Brooklyn Moving Services

U.Santini Moving & Storage underscores its long-standing role as a reliable Brooklyn mover, serving generations

February 26, 2026

Nuclear Science & History Museum Appoints Kyle Harrison, General Partner at Contrary, to the Board of Trustees

Nuclear Science & History Museum Appoints Kyle Harrison, General Partner at Contrary, to the Board of Trustees

The Museum of Nuclear Science & History appointed Kyle Harrison, General Partner at Contrary, to its Board to

February 26, 2026

Pine Services Partners With DATABASICS To Provide Expense Reporting & Timesheets Across Their Managed Service Companies

Pine Services Partners With DATABASICS To Provide Expense Reporting & Timesheets Across Their Managed Service Companies

[DATABASICS] enhances expense management & time tracking… and supports better decision-making through improved

February 26, 2026

Influential Women Profiles Brittany Yurow: Driving Sales Excellence and Customer Partnership in Branchburg, New Jersey

Influential Women Profiles Brittany Yurow: Driving Sales Excellence and Customer Partnership in Branchburg, New Jersey

BRANCHBURG, NJ, UNITED STATES, February 26, 2026 /EINPresswire.com/ — Outside Sales Manager at U.S. LUMBER Brings 20+

February 26, 2026

Digital Agency Network Strengthens Its Position as a Curated Global Marketplace for Digital Agencies and Brands

Digital Agency Network Strengthens Its Position as a Curated Global Marketplace for Digital Agencies and Brands

LONDON, UNITED KINGDOM, February 26, 2026 /EINPresswire.com/ — In a digital marketing landscape increasingly saturated

February 26, 2026

ECOENGINEERS, AN LRQA COMPANY, NAMED BEST VERIFICATION COMPANY IN NORTH AMERICA

ECOENGINEERS, AN LRQA COMPANY, NAMED BEST VERIFICATION COMPANY IN NORTH AMERICA

2026 Environmental Market Rankings by Environmental Finance lists EcoEngineers as Best Verification Company in Three

February 26, 2026

Influential Women Spotlight: Deborah Klein, Strategic Enterprise Account Executive at Comcast Business Nationwide USA

Influential Women Spotlight: Deborah Klein, Strategic Enterprise Account Executive at Comcast Business Nationwide USA

KALAMAZOO, MI, UNITED STATES, February 26, 2026 /EINPresswire.com/ — Driving Strategic Growth and Sales Leadership

February 26, 2026

Global Digital Marketplace Osdire Expands Access to Businesses Following Rapid Freelancer Growth

Global Digital Marketplace Osdire Expands Access to Businesses Following Rapid Freelancer Growth

Osdire expands access to businesses after rapid freelancer growth, offering secure, on-demand digital talent across

February 26, 2026

Maryland Public Libraries Choose Auto-Graphic’s SHAREit to Power Marina, Maryland’s Statewide Interlibrary Loan Network

Maryland Public Libraries Choose Auto-Graphic’s SHAREit to Power Marina, Maryland’s Statewide Interlibrary Loan Network

Every library we support works differently, and it is important that SHAREit sustain and improve each library's unique

February 26, 2026

Grovara Launches Mobile ‘B2B Blaster’ Game at Expo West to Engage Retail Buyers and Emerging CPG Brands

Grovara Launches Mobile ‘B2B Blaster’ Game at Expo West to Engage Retail Buyers and Emerging CPG Brands

Grovara debuts “B2B Blaster” at Expo West, a gamified wholesale experience connecting buyers with vetted global brands

February 26, 2026

Homesage.ai Launches AI-Powered Property Condition Grading System for Real Estate Professionals

Homesage.ai Launches AI-Powered Property Condition Grading System for Real Estate Professionals

New computer vision feature automatically evaluates property condition to help investors make data-driven decisions. By

February 26, 2026

Markus Heitkoetter’s Building Your Financial Fortress Becomes #1 Amazon Best Seller Across Multiple Categories

Markus Heitkoetter’s Building Your Financial Fortress Becomes #1 Amazon Best Seller Across Multiple Categories

New Financial Freedom Book Ranks #1 Across Multiple Major Investment Categories AUSTIN, TX, UNITED STATES, February 26,

February 26, 2026

Hinckley Medical Announces Company Name Change to OneDose, Expands Access to EMS Decision-Support Platform

Hinckley Medical Announces Company Name Change to OneDose, Expands Access to EMS Decision-Support Platform

Hinckley Medical rebrands as OneDose, expanding from a single-product innovation to a comprehensive EMS platform

February 26, 2026

CFA Society Nashville & CFA Society East Tennessee Host Local Round of CFA Institute Greater TN Research Challenge

CFA Society Nashville & CFA Society East Tennessee Host Local Round of CFA Institute Greater TN Research Challenge

11 student teams from the area’s leading universities and business schools competed for a place in the regional

February 26, 2026

Flexible master’s program helping graduate student pursue career goals

Flexible master’s program helping graduate student pursue career goals

UNIVERSITY PARK, PA, UNITED STATES, February 26, 2026 /EINPresswire.com/ — Striving to become an upper-level or

February 26, 2026

Rewind Announces Expansion from Backup to First SaaS Resilience Platform

Rewind Announces Expansion from Backup to First SaaS Resilience Platform

Rewind moves beyond backup to keep businesses operational during SaaS outages Rather than assuming downtime during

February 26, 2026

Chameleon Coffee Launches USDA Organic Functional Flash Brew Ready‑to‑Drink Cans With Erewhon

Chameleon Coffee Launches USDA Organic Functional Flash Brew Ready‑to‑Drink Cans With Erewhon

Next-Generation Coffee Delivers Clean Balanced Energy and Focus Support and Immune Aid — Without the Jitters Our

February 26, 2026

Matexcel Upgrades ASTM Standard Testing Services, Empowering Global Compliance Across Multiple Industries

Matexcel Upgrades ASTM Standard Testing Services, Empowering Global Compliance Across Multiple Industries

SHIRLEY, NY, UNITED STATES, February 26, 2026 /EINPresswire.com/ — Matexcel recently announced the launch of a full

February 26, 2026

NutriHarvest® Highlights Grower Success with a Bountiful Strawberry Harvest

NutriHarvest® Highlights Grower Success with a Bountiful Strawberry Harvest

Strong berry production, supported by slow-release nutrition validated across multiple crops I have 2-40 sq ft

February 26, 2026

Tara Oldridge’s The Truth Will Set You Free Hits Amazon Best Seller List Following Global Launch

Tara Oldridge’s The Truth Will Set You Free Hits Amazon Best Seller List Following Global Launch

SPRING, TX, UNITED STATES, February 26, 2026 /EINPresswire.com/ — The Truth Will Set You Free by Tara Oldridge has

February 26, 2026

Zero-Trust Multi-factor Authentication (MFA) technology added to new government procurement vehicle

Zero-Trust Multi-factor Authentication (MFA) technology added to new government procurement vehicle

Federal government organizations and agencies can now purchase Cyphercor’s MFA software through Innovative Solutions

February 26, 2026

From Traditional MSP to Proactive Security & Compliance Partner, How CSE is Evolving Beyond Helpdesk Support

From Traditional MSP to Proactive Security & Compliance Partner, How CSE is Evolving Beyond Helpdesk Support

CSE evolves its managed services model with proactive security oversight and Liongard integration to reduce risk and

February 26, 2026

Plotly Releases Dash Enterprise 6, a Kubernetes-Native Platform for Data Science Teams

Plotly Releases Dash Enterprise 6, a Kubernetes-Native Platform for Data Science Teams

Plotly announces Dash Enterprise 6, bringing native Kubernetes deployment, and secure-by-default architecture to

February 26, 2026

Spartan Medical Inc. and SI-BONE Inc. Proudly Announce New Partnership to Expand Access For Veterans & Wounded Warriors

Spartan Medical Inc. and SI-BONE Inc. Proudly Announce New Partnership to Expand Access For Veterans & Wounded Warriors

Spartan Medical® and SI-BONE® announce new partnership to expand access to advanced ultra–minimally invasive treatment

February 26, 2026

U.S. Farmers and Ranchers in Action Board Adds Two New Members, Expands Executive Committee

U.S. Farmers and Ranchers in Action Board Adds Two New Members, Expands Executive Committee

Leaders from Nebraska Corn Board, American Pecan Promotion Board join USFRA Board of Directors PARK RIDGE, IL, UNITED

February 26, 2026

Ingrained Recovery’s Dog-Friendly Rehab Removes a Major Barrier to Help: No More Choosing Between Recovery and Your Pup

Ingrained Recovery’s Dog-Friendly Rehab Removes a Major Barrier to Help: No More Choosing Between Recovery and Your Pup

Ingrained Recovery in Georgia welcomes clients' animal companion dogs, recognizing the critical role pets play in

February 26, 2026

Comprehensive Branding Essential for Differentiation in the 2026 Miami Economy

Comprehensive Branding Essential for Differentiation in the 2026 Miami Economy

Miami's market is now a global stage. To compete, brands must project a level of world-class technical and creative

February 26, 2026

Shakenation Releases ‘Therapy,’ A Raw Examination of Mental Health in Modern Hip-Hop

Shakenation Releases ‘Therapy,’ A Raw Examination of Mental Health in Modern Hip-Hop

Chicago artist builds on collaboration with Talib Kweli, signaling a renewed focus on substance and social commentary

February 26, 2026

Get a Little Out There With Alex Honnold Premieres on the Outside Network Thursday, February 26, 2026

Get a Little Out There With Alex Honnold Premieres on the Outside Network Thursday, February 26, 2026

The five-part series marks Alex Honnold's first role hosting a travel show RENO, NV / ACCESS Newswire / February 26,

February 26, 2026

Schizophrenia & Psychosis Action Alliance & Treatment Advocacy Center Co-Design National Mental Illness Justice Center

Schizophrenia & Psychosis Action Alliance & Treatment Advocacy Center Co-Design National Mental Illness Justice Center

S&PAA and TAC convene cross sector leaders April 23 in DC to shape founding principles for a National Mental

February 26, 2026

Creative BioMart Introduces New Product Line to Advance Fc Receptor Research

Creative BioMart Introduces New Product Line to Advance Fc Receptor Research

SHIRLEY, NY, UNITED STATES, February 26, 2026 /EINPresswire.com/ — Creative BioMart, a global leader in

February 26, 2026

Electroninks to Present Industry-Leading Silver Metal Complex Product Suite Platform for EMI Shielding at IMAPS DPC 2026

Electroninks to Present Industry-Leading Silver Metal Complex Product Suite Platform for EMI Shielding at IMAPS DPC 2026

AUSTIN, TX, UNITED STATES, February 26, 2026 /EINPresswire.com/ — Electroninks, the leader in metal complex inks for

February 26, 2026

Genivent Declares Its January Distribution – Annualized 17.05%

Genivent Declares Its January Distribution – Annualized 17.05%

CALGARY, AB, CANADA, February 26, 2026 /EINPresswire.com/ — Genivent Partners LP (“Genivent”) is pleased to announce

February 26, 2026

New European Survey of Rare Disease Patients Exposes Access Gaps and Urgent Need to Redesign Care Pathways

New European Survey of Rare Disease Patients Exposes Access Gaps and Urgent Need to Redesign Care Pathways

Listening to patients: Sciensus and Rare Patient Voice share new insights that reveal critical opportunity to improve

February 26, 2026

FMSI Relaunches, Bringing Renewed Focus to Branch Performance for Banks and Credit Unions

FMSI Relaunches, Bringing Renewed Focus to Branch Performance for Banks and Credit Unions

After divestiture, the company is investing in its platform and client service with momentum already building Being on

February 26, 2026

Zonar Approved as First Telematics Provider for OEM-Based California Air Resources Board Clean Truck Check Compliance

Zonar Approved as First Telematics Provider for OEM-Based California Air Resources Board Clean Truck Check Compliance

New executive order enables OEM-installed and hardwired vehicles to meet California emissions requirements without

February 26, 2026